Project Planning Services
1. Schedules
1.1 The Activity Listing broken down to an optimal level detail and arranged such that it is reviewable and manageable at different levels of management hierarchy while retaining the required level of control by the implementers.
1.2 Activity logic linking all activities in an optimal manner without imposing unnecessary constraints or allowing generous floats.
1.3 Activity loading – The purposes of this is to ensure that the schedule is able to preempt slippages and take proactive corrective measures. It also enables establishing a basis for VOWD calculations.
2. Cost Estimates:
The Cost Estimate development covers application of an adequate basis for generating the estimates to the adequate level of detail, including normalization with adequate factors for ‘money of the day’, inflation, contingency etc .
3. Resources:
The Resources proposal covers sufficiency and competence of resources, their compatibility and integrations. Also covered is clarity on common objectives and roles and responsibilities.
4. Site:
This provides an assessment on requirements covering site data, site accessibility, site logistics, temporary facilities, availability of early drawings, status of permits to build etc.